Before your wet room in Harborne
Work like this in Harborne rarely needs planning permission, but parts of the job must meet Building Regulations — certified electrical work, ventilation or energy-efficiency standards, for example. Your quote shows how each part is signed off. If planning does come into it, say for a listed building, Birmingham City Council is the authority.
- Fixing backing boards behind the tiles now makes adding grab rails later much easier.
- Extract fans in a bathroom without an openable window should run on for around 15 minutes after use.
- A wet room's whole floor and the walls around the shower are covered with a waterproof membrane before tiling.
- Postcode district
- B17
- Planning and building control
- Birmingham City Council
- From our West Bromwich base
- 4 miles
Choices to weigh up in Harborne
Ground floor on concrete
The existing screed is cut out where the shower sits so the former can be recessed level with the floor, and the waste is connected below the slab. It's dustier work but very solid once complete. Older concrete floors without a damp-proof membrane need extra care before tanking.
Level-access walk-in shower
Instead of falling across the whole room, a sloped former is set flush into the floor only in the shower area, with the rest of the floor flat. It gives step-free access at a slightly lower cost. The surrounding floor and walls are still waterproofed, because water rarely stays exactly where it's meant to.
What does your wet room cost in Harborne?
For a home in Harborne, our guide range is £5,000–£15,000 depending on size and specification. Converting a 2 m × 2.5 m bathroom into a fully tanked wet room with a level-access floor: usually £6,800–£9,000.
| Option | Guide price | Good to know |
|---|---|---|
| Level-access walk-in shower in an existing bathroom | £5,000 – £7,000 | Former in the shower area only |
| Full wet room, fully tanked | £6,500 – £9,500 | Suits a standard-size bathroom |
| Accessible or larger wet room | £9,000 – £15,000 | Rails, seat, wider door, underfloor heating |
Guide ranges include VAT where it applies. We confirm a fixed price for the agreed specification after visiting.
Questions about wet rooms in Harborne
How much does a wet room cost?
In the West Midlands, wet rooms typically cost £5,000–£15,000, including VAT where it applies. Converting a 2 m × 2.5 m bathroom into a fully tanked wet room with a level-access floor usually costs £6,800–£9,000. Accessible wet rooms with rails, a seat and a wider door, or larger rooms with underfloor heating, sit at the upper end of the range.
Do you cover Harborne?
Yes. Harborne (B17) is about 4 miles from our West Bromwich base and inside the area we cover. Call 0800 088 6248 or send the form on this page to book a free survey.
Can a wet room be fitted upstairs?
Yes. On timber floors, we lift the boards, check and strengthen the joists if needed, lay structural plywood and set a shower former between the joists. The waste route needs care, because it must fall to the soil stack without cutting joists beyond safe limits. If that's not possible, a pumped shower drain can be used.
Will I need permission from the council in Harborne?
You won't usually need planning permission, but the work must meet Building Regulations. Building control in Harborne is provided by Birmingham City Council or a registered building control approver, and some work is self-certified by registered installers.
Close to Harborne
Other work we do in Harborne
- Kitchen fitting in Harborne
- En-suite bathrooms in Harborne
- Kitchen makeovers in Harborne
- Single-storey extensions in Harborne
- Knock-through walls in Harborne
- uPVC windows in Harborne
Book a free wet room survey in Harborne, and we'll check the floor and drainage before recommending a layout.